Location : Phongsaly (Bounneur-Lanetouy)
Length of Road: 141.7 Km
Width: 20 m
Consultant Cost: USD 661,017
Construction Cost: USD 91,590,903
Type: Double Bituminous Surface Treatment
Funded by: China Bank (Loan)
Construction Supervision Period : Sep. 2013 - Feb. 2018
Construction Supervision of Double Bituminous Surface Treatment, the services comprise of the supervision of Construction, contract management, Preparation of Monthly progress reports, Material quality control, Topographic survey, Geotechnical investigation and laboratory testing.