Hinheup Bridge

Location : Vientiane Province
Length of approach Road: 350 m
Length of Bridge: 195 m
Width: 3.5 m x 2 Lane
Type: Segmental Box Girder / Concrete pavement
Funded by: JICA
Construction Supervision Period: 2009 - 2011

This project funded by JICA. The objectivity of the project is to construction of a new concrete bridge (Segmental box girder bridge) with two - lane two - way cross over Nam Lik for through traffic, and remain the existing bailey bridge with one - lane two - way for local traffic and for a memorial to history. Consultancy services are as follows:

Survey and Design phase:

LTEC has conducted preliminary survey included Initial Environmental Examination (IEE) and report preparation. Then conducted details topographic survey and geological investigation

Supervision phase:

LTEC has signed contact with Oriental Consultant (Japan) carry on construction supervision